The 1st- stage empty-field mining method should be applied to the steeply inclined medium-thick ore body and the inclined or gently inclined thick ore body; when the ore body thickness is greater than 50m , the longitudinal column of the room should be retained;
2 The steeply inclined ore body with stable ore should adopt segmental rock drilling and stage mining; for ore body with poor stability or inclination, segmental rock drilling and segmental mining should be adopted;
The height of the 3 sections shall be determined comprehensively according to the rock drilling depth of the rock drilling equipment and the inclination angle of the ore body;
4 The upper and lower adjacent stages of the same ore body and the ore and pillar arrangement of adjacent parallel ore bodies in the same stage shall have the same specifications, and the upper and lower sides and the front and rear shall correspond to each other;
5 Except for the roadway that is used for mining, transportation, filling and ventilation, other roadways shall not be dug in the top pillar of the stope .

Material EPDM,NR,Silicone,FKM,IIR,NBR,SBR,Sponge,Rubber,or Custom Compound
(Any custom compound rubber is available)
Size According to samples or drawings
Color Black,white,red,green,transparent or any color according to Pantone colors
Finish High Gloss,Fine Grain,Electroplating,Painting,Printing,Texture etc,or as request
Type Round,square,rectangular,or any nonstandard shape as request
Logo Debossed,embossed,printed logo or as request

Boat Trailer Rollers

Boat Trailer Parts,Boat Trailer Rollers,Boat Trailer Accessories,Boat Trailer Spares

Jinan Paiwo Engineering Machinery Co.,Ltd , https://www.paiwoforging.com