With a wide range of phases, fully automated nuclear phases from 10V to 550kV can be realized. Based on years of customer feedback information, two power supply methods have been designed—rechargeable battery power and general battery power supply. When the rechargeable battery of the instrument is damaged, the user can purchase an ordinary battery instead.

In order to avoid improper operation and damage to the instrument, charge and replace the battery of the high-voltage nuclear phase meter to perform related operations, as follows:

1, to inform customers! The battery cover is not covered properly to prohibit charging or use.

2. Do not use the meter for a long time. Charge the rechargeable battery at least once every three months.

3, generally 2 hours to complete the charge, is strictly prohibited overcharged for a long time.

4, replace the use of ordinary batteries, please pay attention to the battery polarity.

5, the use of ordinary non-rechargeable batteries, it is strictly prohibited to charge the battery.

6, the use of ordinary non-rechargeable battery, remove the battery for a long time without the instrument.

7, when the battery voltage is insufficient, the voltage is low symbol display, please charge the battery in time, if the battery power is not enough after multiple charges, please replace the new battery.

8, if the user is not convenient to buy rechargeable batteries with the same specifications, you can buy ordinary batteries instead of using (host computer with 1.5V, LR6 battery 6 nodes; detector with 6F22 9V each one).

9. When replacing the battery, make sure the instrument is turned off. Detector battery replacement: Loosen the four screws on the bottom cover of the detector. Carefully open the bottom cover and replace it with a brand-new qualified battery. If you continue to use a lithium battery with the same specifications, you need to use the corresponding solder connection.

10. The detector reserves a 6F22 battery interface. If the 6F22 battery is replaced, the original lithium battery needs to be removed and the 6F22 battery can be installed.

11. Replacement of the main unit battery: Loosen a screw of the main battery cover, open the main battery cover, and replace the new qualified battery.

12, pay attention to the battery specifications polarity, cover the bottom cover or battery cover, tighten the screws.

13, the host can use 1.5V, LR6 battery.

14. After the battery is replaced, press the POWER button to confirm that the battery has been replaced successfully.

15. Replace batteries must be replaced in strict accordance with the equivalent performance and parameters of the battery.

Transom Mount Trolling Motor

Transom Mount Trolling Motor, Hand Control Trolling Motors, Inflatable Boat Motors

Ningbo Haibo Group Co.,Ltd. , http://www.hbtrollingmotors.com